日期:2014-05-17  浏览次数:21266 次

v$resource_limit视图中几个字段是什么意思?
current_utilization
max_utization
initial_allocation
limit_value
分别代表什么意思?

------解决方案--------------------
从Oracle的Reference文档里面摘录的,基本上就是标识一些系统资源的使用、设置情况的。
current_utilization - Number of (resources, locks, or processes) currently
being used

max_utization - Maximum consumption of the resource since the last
instance start up

initial_allocation - Initial allocation. This will be equal to the value
specified for the resource in the initialization parameter
file (UNLIMITED for infinite allocation)

limit_value - Unlimited for resources and locks. This can be greater
than the initial allocation value (UNLIMITED for infinite
limit).